Free procurement tool
Robot pilot evaluator
Upload a pilot log from your fleet manager, WMS or spreadsheet, set your acceptance gates, and get a Go/No-Go scorecard calculated the same way as a Rovidence report. No sign-up. The file stays in your browser.
Checking every weekly export? Your engineer or integrator can run the same check automatically with our free Python tool: pip install rovidence-eval
1. Pilot log
Any shift or daily export works. We’ll help you match the columns. The file is read in your browser and never uploaded.
2. Acceptance gates
Your go/no-go thresholds, ideally agreed before the pilot started. Leave a gate blank to turn it off.
Costs, baseline and labels (for cost per task and payback)
Result
Proceed to a phased rollout, conditional on the vendor closing the gaps on availability and interventions. Re-measure all acceptance gates at 90 days.
GO: every gate passed. CONDITIONAL GO: at least two-thirds passed, and each miss becomes a condition. NO-GO: fewer than two-thirds passed.
| Metric | Required | Measured | Result |
|---|---|---|---|
| ≥ 92% | 91.2% | Miss | |
| ≥ 200 h | 212 h | Pass | |
| ≤ 60 min | 47 min | Pass | |
| ≥ 95% | 96.8% | Pass | |
| ≤ 10 / 1,000 tasks | 14.3 / 1,000 tasks | Miss | |
| ≤ £0.15 | £0.14 | Pass | |
| ≤ 24 months | 22 months | Pass |
Select a metric to see how it was calculated from your file. Methodology
Conditions for the vendor
- Vendor to demonstrate availability ≥ 92% (measured 91.2%) at re-measurement.
- Vendor to demonstrate interventions ≤ 10 / 1,000 tasks (measured 14.3 / 1,000 tasks) at re-measurement.
What the numbers show
- #1 failure cause: Thermal faults, 38% of 98 failure events (site averaged 31.0°C).
- #1 intervention cause: Exception handling (damaged / unreadable items), 61% of 9,152 interventions.
- At ~2 minutes per intervention, that's ~305 hours of operator time over 12 weeks — roughly 68% of a full-time role shifted onto your floor team.
- 3 safety events logged; safety checks took 1,160 minutes of scheduled time.
Week by week (12 weeks, 84 days)
| Week | From | Days | Temp | Availability | Mission success | MTBF | MTTR | Interv. / 1k | Cost / task |
|---|---|---|---|---|---|---|---|---|---|
| 1 | 2026-06-08 | 7 | 28.4°C | 92.4% | 95.2% | 346 h | 43 min | 16.4 | £0.16 |
| 2 | 2026-06-15 | 7 | 29.2°C | 92.2% | 95.8% | 247 h | 46 min | 15.7 | £0.15 |
| 3 | 2026-06-22 | 7 | 30.0°C | 91.7% | 96.3% | 216 h | 36 min | 15.2 | £0.14 |
| 4 | 2026-06-29 | 7 | 30.9°C | 91.1% | 96.6% | 192 h | 47 min | 14.9 | £0.14 |
| 5 | 2026-07-06 | 7 | 31.8°C | 90.5% | 96.8% | 173 h | 52 min | 14.6 | £0.14 |
| 6 | 2026-07-13 | 7 | 32.6°C | 90.0% | 96.8% | 157 h | 52 min | 14.4 | £0.14 |
| 7 | 2026-07-20 | 7 | 33.3°C | 89.8% | 96.7% | 157 h | 39 min | 14.2 | £0.14 |
| 8 | 2026-07-27 | 7 | 33.0°C | 89.9% | 96.9% | 157 h | 56 min | 13.9 | £0.14 |
| 9 | 2026-08-03 | 7 | 32.1°C | 91.0% | 97.2% | 216 h | 40 min | 13.6 | £0.14 |
| 10 | 2026-08-10 | 7 | 31.2°C | 91.5% | 97.4% | 247 h | 39 min | 13.3 | £0.13 |
| 11 | 2026-08-17 | 7 | 30.1°C | 92.2% | 97.5% | 288 h | 57 min | 13.0 | £0.13 |
| 12 | 2026-08-24 | 7 | 29.4°C | 92.2% | 97.6% | 346 h | 58 min | 12.8 | £0.13 |
Save or share the result
The free rovidence-eval Python tool gives the same verdict from the same file, so it can run on each new export as a scheduled job. Download the gates, then:
pip install rovidence-eval rovidence-eval run sample_pilot_log.csv --gates acceptance_gates.yaml
Computed in your browser with the formulas on the methodology page. Not reviewed by Rovidence, so treat the figures as self-reported (Tier 3) until the underlying export is verified.
Questions
What do GO, CONDITIONAL GO and NO-GO mean?
GO means every acceptance gate passed. CONDITIONAL GO means at least two-thirds passed, and each miss becomes a condition the vendor has to close before rollout. NO-GO means fewer than two-thirds passed. Rovidence uses the same rule in every report.
Is my file uploaded?
No. It’s read and scored in your browser. Nothing reaches Rovidence unless you create an account and import it into an evaluation.
My fleet manager uses different column names. Can I still use it?
Yes. Upload the export and match its columns to Rovidence’s fields. Hours, minutes and seconds are converted, and you choose whether the dates are UK, US or ISO.
Why does charging count against availability?
A robot can’t work while it charges or while a safety check runs, so both reduce the time it is actually available. Vendors often leave them out, which is how 91% becomes “99% uptime”. The availability calculator shows how far the definition moves the number.
Can an engineer reproduce the result?
Yes. rovidence-eval, our free and open-source Python tool, uses the same formulas and verdict rule. Download the gates and run it on the same file. The JSON report carries SHA-256 hashes, so anyone can check it hasn’t been edited and that it came from that file.