Free procurement tool

Robot pilot evaluator

Upload a pilot log from your fleet manager, WMS or spreadsheet, set your acceptance gates, and get a Go/No-Go scorecard calculated the same way as a Rovidence report. No sign-up. The file stays in your browser.

Checking every weekly export? Your engineer or integrator can run the same check automatically with our free Python tool: pip install rovidence-eval

1. Pilot log

Any shift or daily export works. We’ll help you match the columns. The file is read in your browser and never uploaded.

Illustrative sample data
216 rows · 12 weeks · 2026-06-08 → 2026-08-29
Download CSV template

2. Acceptance gates

Your go/no-go thresholds, ideally agreed before the pilot started. Leave a gate blank to turn it off.

%
Uptime ÷ scheduled time
h
Fleet hours per failure
min
Repair minutes per failure
%
Completed ÷ assigned tasks
/ 1,000 tasks
Human assists per 1,000 tasks
£
Needs costs
months
Needs costs and baseline
Blank = first date in the file
Costs, baseline and labels (for cost per task and payback)
£, fleet
Lease, RaaS fee or capex amortisation
£ / hour
Fully loaded
£
£, one-off
months
£
Used for payback
tasks / labour hour
Before the robots. Needed for payback
minutes
Default 2
hours / week
Default 37.5

Result

Sample dataIllustrative sample data, not a real deployment. This is the generated 12-week AMR pilot behind our sample report. Upload your own pilot log to score it.
Verdict
CONDITIONAL GO
Proceed only if the conditions below are met
5/ 7
acceptance gates met

Proceed to a phased rollout, conditional on the vendor closing the gaps on availability and interventions. Re-measure all acceptance gates at 90 days.

GO: every gate passed. CONDITIONAL GO: at least two-thirds passed, and each miss becomes a condition. NO-GO: fewer than two-thirds passed.

MetricRequiredMeasuredResult
≥ 92%91.2%Miss
≥ 200 h212 hPass
≤ 60 min47 minPass
≥ 95%96.8%Pass
≤ 10 / 1,000 tasks14.3 / 1,000 tasksMiss
≤ £0.15£0.14Pass
≤ 24 months22 monthsPass

Select a metric to see how it was calculated from your file. Methodology

Conditions for the vendor

  • Vendor to demonstrate availability ≥ 92% (measured 91.2%) at re-measurement.
  • Vendor to demonstrate interventions ≤ 10 / 1,000 tasks (measured 14.3 / 1,000 tasks) at re-measurement.

What the numbers show

  • #1 failure cause: Thermal faults, 38% of 98 failure events (site averaged 31.0°C).
  • #1 intervention cause: Exception handling (damaged / unreadable items), 61% of 9,152 interventions.
  • At ~2 minutes per intervention, that's ~305 hours of operator time over 12 weeks — roughly 68% of a full-time role shifted onto your floor team.
  • 3 safety events logged; safety checks took 1,160 minutes of scheduled time.
Availability by week
latest 92.2%
weeks outside the gate
Interventions per 1,000 tasks
latest 12.8
weeks outside the gate
Failures by cause
Interventions by cause
Week by week (12 weeks, 84 days)
WeekFromDaysTempAvailabilityMission successMTBFMTTRInterv. / 1kCost / task
12026-06-08728.4°C92.4%95.2%346 h43 min16.4£0.16
22026-06-15729.2°C92.2%95.8%247 h46 min15.7£0.15
32026-06-22730.0°C91.7%96.3%216 h36 min15.2£0.14
42026-06-29730.9°C91.1%96.6%192 h47 min14.9£0.14
52026-07-06731.8°C90.5%96.8%173 h52 min14.6£0.14
62026-07-13732.6°C90.0%96.8%157 h52 min14.4£0.14
72026-07-20733.3°C89.8%96.7%157 h39 min14.2£0.14
82026-07-27733.0°C89.9%96.9%157 h56 min13.9£0.14
92026-08-03732.1°C91.0%97.2%216 h40 min13.6£0.14
102026-08-10731.2°C91.5%97.4%247 h39 min13.3£0.13
112026-08-17730.1°C92.2%97.5%288 h57 min13.0£0.13
122026-08-24729.4°C92.2%97.6%346 h58 min12.8£0.13

Save or share the result

Check every weekly export automatically

The free rovidence-eval Python tool gives the same verdict from the same file, so it can run on each new export as a scheduled job. Download the gates, then:

pip install rovidence-eval
rovidence-eval run sample_pilot_log.csv --gates acceptance_gates.yaml

Computed in your browser with the formulas on the methodology page. Not reviewed by Rovidence, so treat the figures as self-reported (Tier 3) until the underlying export is verified.

Questions

What do GO, CONDITIONAL GO and NO-GO mean?

GO means every acceptance gate passed. CONDITIONAL GO means at least two-thirds passed, and each miss becomes a condition the vendor has to close before rollout. NO-GO means fewer than two-thirds passed. Rovidence uses the same rule in every report.

Is my file uploaded?

No. It’s read and scored in your browser. Nothing reaches Rovidence unless you create an account and import it into an evaluation.

My fleet manager uses different column names. Can I still use it?

Yes. Upload the export and match its columns to Rovidence’s fields. Hours, minutes and seconds are converted, and you choose whether the dates are UK, US or ISO.

Why does charging count against availability?

A robot can’t work while it charges or while a safety check runs, so both reduce the time it is actually available. Vendors often leave them out, which is how 91% becomes “99% uptime”. The availability calculator shows how far the definition moves the number.

Can an engineer reproduce the result?

Yes. rovidence-eval, our free and open-source Python tool, uses the same formulas and verdict rule. Download the gates and run it on the same file. The JSON report carries SHA-256 hashes, so anyone can check it hasn’t been edited and that it came from that file.

Give feedback

Something not working, or an idea to improve Rovidence? Tell us. No account needed.

Private to the Rovidence team. Includes the page type and, when signed in, your account and role. No pilot data or uploaded files are attached. Please leave out passwords and confidential information. Privacy policy